.png)
(325) 298-7858
Steel Structures
DELIVERY & INSTALLATION


Star buildings & carports & American Steel Inc. offers free delivery & installation on level land
Delivery/ Installation Time
- Steel Buildings: Average lead time 2-4 weeks but may vary depending on size of unit
- Carports: Typical installation, 2-3 hours weather permitting
- Large Barn or Shop: 2-5 days weather permitting
Preparing For Your Shed Delivery / Set Up Info & Requirements
- Site prep is your responsibility. Please have desired location cleared of any debris or obstructions.
- Site must be level!
- We must have access to the site! Access requirements vary depending on building type. Contact us for more information.
- If purchasing a fully assembled building, access to the area is crucial for a pleasant delivery for you. (The delivery driving needs to be able to access the area with a fully assembled unit)
- The customer is responsible for determining ground conditions prior to delivery. (Delivery is not advised if ground is soft or wet)
- May want to mow the area so your building does not settle on tall grass.
- We deserve the right to reschedule delivery if the ground is not adequate for safe, non-destructive delivery.
- The customer is responsible for identifying any underground sewer or water lines that may be damaged upon delivery.
- The customer is responsible for any damage to yard or driveway etc.
- The customer is responsible for any HOA requirements and/or obtain permits. You may need to obtain a building permit from your local permitting office.
- We require an additional 4' of width & 4' height clearance.
- We don't set units on any raised platforms or piers.
Steel Frame Buildings:
- For Star Buildings & Carports, we recommend being within level tolerance of 1-3" for installation & all concrete pads be poured 2" wider on all sides. Units 12’×20′ need to have 12’4”x20’4” Concrete Pad. Be sure to check with your local permitting office to ensure you are within their guidelines for your concrete pad and structure.
- For a metal garage, we recommend a concrete foundation although it can be installed on dirt, asphalt, roadbase, or gravel.
- If building is fully enclosed, must be level.